Demolition · Ottawa
House demolition in Ottawa, planned from the paperwork up
Taking a house down takes a day or two. Getting to that day takes weeks of permits, disconnects and surveys. We map the whole sequence with you at the start so the demolition date is real and the lot is ready for your builder.
- WSIB WSIB covered WSIB coverage for our crew.
- Insurance Liability insured Liability insurance in place.
- Local Ottawa crew Based in Ottawa, working across the city and the surrounding area.
- Quotes In writing Demolition quoted on site. Junk removal priced from photos.
Scope
What’s included
- Readiness review at the site visit: permit, utilities, survey and access, with realistic lead times
- Checklist of the clearance letters the City asks for with the demolition permit application
- Coordination with your survey, abatement and utility contacts so dates line up
- Ontario One Call locate request before any ground work
- Demolition of the house and attached structures, with sorting for recycling
- Foundation removal and backfill to the scope in your quote
- Lot raked and left clean, with the road and sidewalk swept
Not included
- Asbestos or designated-substance abatement. Done by a licensed contractor before demolition
- Utility disconnects themselves. The owner requests these from Enbridge, Hydro Ottawa and the City; we help you with what to ask for
- Tree removal (our sister company ZZ Chop Tree Care can handle it in the same schedule)
Quoted on site
Every demolition job is priced in person. We walk the space with you, check access and the age of the building, then send a written quote.
Book a site visitOttawa notes
The Ottawa house demolition timeline
Enbridge gas disconnects take roughly 44 days from payment. This is almost always the longest item, so request it first.
Hydro Ottawa asks for the electrical service request three to four weeks ahead. The City handles water and sewer capping, and a sewer disconnection fee may apply.
Every house demolition needs a City of Ottawa demolition permit, and properties under the Demolition Control By-law or heritage designation have extra steps. Starting work without a permit carries a surcharge. We can help sort out the permits.
A house built before 1990 needs a designated-substances survey, and any asbestos removed by a licensed contractor, before demolition.
Plan on six to eight weeks from your first call to demolition day. The demolition itself is usually one to three days.
Footings and foundation walls come out after the house is down, to the scope in your quote. See slab and foundation removal for what is left when we finish.
Where it comes up most: Westboro (narrow-lot infill), Nepean (post-war bungalow teardowns), Alta Vista (bungalows on treed lots) and rural Ottawa (farmhouses on well and septic).
What affects the price
- Size of the area and how much is coming out
- Access: stairs, elevators, parking and how far we carry debris
- Material weight and disposal: tile, plaster and concrete cost more to dump than drywall
- Building age, protection needed for what stays, and any working-hours limits
We do not remove asbestos. If the building might have it, a designated-substances survey and licensed abatement come first, then we demolish.
More on permits, utilities and timelines · About ZZ Demolition: WSIB covered and liability insured
FAQ
House Demolition: common questions
How long does it take to demolish a house in Ottawa?
The demolition itself is usually one to three days. The paperwork is what takes time: plan six to eight weeks from start to finish, mostly because the Enbridge gas disconnect takes about 44 days from payment.
Do I need a permit to demolish a house in Ottawa?
Yes. A City of Ottawa demolition permit is required, and the application asks for utility clearances. The fee is higher if the property is under Demolition Control or heritage designation, and we can help sort out the permits.
Who arranges the utility disconnects?
The property owner requests them, because the utilities deal with the account holder. We give you the list, the phone numbers and the order to call them in, and we track the dates with you.
Do you remove the foundation?
If your quote includes it, yes: foundation walls and footings removed, and the hole backfilled and graded to the level your builder asks for. Some builders want the hole left open; we quote to your plan.
What happens to the debris?
Mixed construction and demolition waste goes to licensed sorting facilities. Metal goes to scrap recycling and clean concrete and brick go to clean-fill recycling. Weigh tickets are available on request.
Can you quote before the asbestos survey is done?
Yes, with a condition: the quote assumes a clean survey or completed abatement. If abatement is needed, it happens first, and the demolition date moves to after the clearance letter.
Service areas
Related: Garage, Shed & Deck Removal · Concrete & Asphalt Removal · Full Interior Gut · All services
Request a quote
Ready when you are. Let’s get it out.
Demolition is quoted on site: book a visit and we walk the job with you. Junk removal? Text us a few photos and we send a price back.