House interior stripped to the wood studs and ceiling joists, every finish removed and the floor cleared

Demolition · Ottawa

Basement demolition in Ottawa

Old paneling, a soaked carpet, a drop ceiling that has seen better days. We take the finished basement back to the foundation walls and the slab, carry every load up the stairs and out, and leave a clean, open space for your contractor, waterproofer or adjuster.

  • WSIB WSIB covered WSIB coverage for our crew.
  • Insurance Liability insured Liability insurance in place.
  • Local Ottawa crew Based in Ottawa, working across the city and the surrounding area.
  • Quotes In writing Demolition quoted on site. Junk removal priced from photos.

Scope

What’s included

  • Protection on the stairs and the path out, poly at the top of the stairs and sealed furnace returns
  • Drywall or paneling, framing, insulation and vapour barrier removed back to the foundation walls
  • Drop ceilings, drywall ceilings, carpet and underpad, laminate and tile taken out
  • Built-ins, bars and the basement bathroom removed once your plumber has capped the lines
  • Slab sections broken out where your plumber or contractor has marked them, for example for new drains
  • Every load carried up and out, then taken to licensed sorting and recycling facilities
  • Final sweep and shop-vac, so the walls and floor can be inspected

Not included

  • Water extraction, drying and mould remediation. A restoration or remediation contractor does those
  • Waterproofing, foundation repair, underpinning or lowering. We clear the way for the contractor who does it
  • Asbestos, vermiculite or other designated-substance removal. A licensed abatement contractor does that first

Part of our interior demolition & strip-outs service: the same protection, crew and clean-up standard on every job.

Quoted on site

Every demolition job is priced in person. We walk the space with you, check access and the age of the building, then send a written quote.

Book a site visit

Ottawa notes

Before you tear out an Ottawa basement

Taking out finishes and non-load-bearing partitions does not need a demolition permit on its own, according to the City’s demolition permit page. Finishing the basement again usually does: the City says alterations over 10 square metres need a building permit, with inspections along the way. Apply early so the timing works.

Flooded basement: call your insurer first and let the adjuster see the damage, or photograph every room before anything is touched. We photograph each stage as we strip it and keep weigh tickets for the claim.

Basements in houses built before 1990 are where the usual suspects turn up: 9×9 floor tiles under the carpet, wrap on old heating pipes, vermiculite, textured ceilings. The designated-substances survey comes before we start.

The stairs set the pace. Narrow or turning stairs, low headroom and a long carry to the truck all add time, so we walk the route out on the site visit before we price. Need the floor opened for new drains? See concrete cutting and breaking.

Where it comes up most: Barrhaven (first-generation basements), Orléans (water-damaged basements), Riverside South (builder-grade basements being finished properly) and The Glebe (low basements before waterproofing).

What affects the price

  • Size of the area and how much is coming out
  • Access: stairs, elevators, parking and how far we carry debris
  • Material weight and disposal: tile, plaster and concrete cost more to dump than drywall
  • Building age, protection needed for what stays, and any working-hours limits

We do not remove asbestos. If the building might have it, a designated-substances survey and licensed abatement come first, then we demolish.

More on permits, utilities and timelines · About ZZ Demolition: WSIB covered and liability insured

FAQ

Basement Demolition: common questions

How long does basement demolition take?

A full finished basement usually takes two to three days, depending on how much is finished and how far we carry. One room or a basement bathroom is often a single day.

Can you tear out a basement after a flood?

Yes, once the water is out. We strip the wet drywall, insulation, carpet and framing, photograph each stage for your adjuster and keep weigh tickets. Drying and mould remediation are done by a restoration company.

Do I need a permit to tear out my basement?

Not usually for the tear-out alone, because non-load-bearing partitions are exempt from a demolition permit. Refinishing it afterwards normally needs a building permit, so start that application early.

Can you break up part of the basement floor?

Yes. We break out the slab sections your plumber or contractor has marked, once anything running through the slab is confirmed safe. Underpinning and lowering are done by the contractor who engineered them.

What happens to the furnace and water heater?

They stay where they are. We work around them, keep dust off with poly and sealed returns, and your heating contractor moves anything that has to move.

Do I need to empty the basement first?

No. We can clear stored contents and junk as the first step of the same job, and set aside anything you want kept.

Related: Interior Demolition & Strip-Outs · Full Interior Gut · Junk Removal · All services

Request a quote

Ready when you are. Let’s get it out.

Demolition is quoted on site: book a visit and we walk the job with you. Junk removal? Text us a few photos and we send a price back.